Рус / Eng

New requirements to the composition, content and procedure for issuing the conclusion of the state expertise

7 September 2018

slider slider

Since September 1,  2018 new requirements to the composition, content and procedure for issuing the conclusion of the state expertise come into force.
On the official Internet portal of legal information pravo.gov.ru issued an order of the Ministry of Construction of Russia of June 8, 2018 No. 341 / pr "On approval of the Requirements for the composition, content and procedure for issuing a conclusion of the state examination of design documentation and (or) the results of engineering surveys" . The need to change the Requirements is due to the transition to the maintenance of a unified state register of expert opinions on the design documentation for capital construction projects (EGRZ) and the need to formalize an opinion in the form of an electronic document. The document comes into force on September 1, 2018.

The new requirements specify the list of information to be included in the conclusion necessary to correctly include information on such a conclusion in the USRP in accordance with the Rules for the formation of a unified state register of opinions on the examination of design documentation for capital construction objects approved by the Russian Government Resolution No. 878 of July 24, 2017 .

In addition, the new version of the Requirements describes the features of assigning the numbers of the conclusions of the state expertise of the design documentation and (or) the results of engineering surveys, taking into account the start of the YGRZ.

Order of the Ministry of Construction of Russia of June 8, 2018 No. 341 / np was prepared in accordance with paragraph 37 of the Regulations on the organization and conduct of state expertise of design documentation and engineering survey results approved by Government Decree No. 145 of March 5, 2007.

The document also recognizes the decree of the Ministry of Construction of Russia of December 9, 2015, No. 887 / pr., as invalid.

All news

Institute projects